Process Terminology


cycle time: the average time between completion of successive units

bottleneck: the factor which limits production

work in process:  inventory in the system

manufacturing lead time (throughput time): length of time spent in the process

Little's Law: MLT = WIP * CT

throughput time = work in process x cycle time

idle time: time when useful work is not being performed

balance/imbalance: perfect balance; no idle time

lot size: number of units of like product produced at once

setup time: time between good units of succeeding products

direct labor content: work contained in the product

direct labor utilization: direct labor content/total available labor time

process: transform inputs into outputs


outputs: goods or service

use process flow diagram to illustrate process

Notice different setups with same equipment

(figure 1: parallel lines)

(figure 2: tasks into parallel, not entire lines)

Determining capacity: depends on situation

Capacity: maximum output per unit of time

Types of Inputs

Types of Outputs Tasks, flows, storage Storage Process characteristics

capacity

efficiency flexibility quality